To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Mittelplate
Location of Mittelplate
CountryGermany
Offshore/onshoreOffshore
Coordinates54°01′33″N 8°43′52″E / 54.0259°N 8.731°E / 54.0259; 8.731
OperatorWintershall Dea
OwnerWintershall Dea
Field history
Discovery1981
Start of production1987
Production
Producing formationsMiddle Jurassic

Mittelplate is Germany's largest oil field, 7 km (4.3 mi) from the shore, in the environmentally important Schleswig-Holstein Wadden Sea National Parks tidal flats.[1] The development of the field was done by a consortium of RWE Dea and Wintershall. By the 20th anniversary of the start of production, 20 million tonnes (22,000,000 tons) (about 146 million barrels) of crude had been produced from the field.[2] Mittelplate field holds nearly 65% of Germany's crude oil reserves.[3]

YouTube Encyclopedic

  • 1/3
    Views:
    205 184
    6 319
    17 398
  • Wie kommt das Erdöl aus der Erde? | Reportage mit Willi Weitzel | Willi wills wissen
  • Mit JAN CUX 2 zur Förderanlage Mittelplate
  • Das Leben auf einer riesigen Offshore-Plattform mitten im Ozean

Transcription

History

The field was discovered in 1981 through the Mittelplate 1 well, which confirmed that the reservoir contained 75 million tonnes (83,000,000 tons) of crude oil. As early as the 1950s, geologists suspected the presence of oil off the German coast. Preliminary test drilling in the 1960s did indeed turn up indications of oil, though not in economically profitable quantities. The oil crisis of 1973 and 1979 raised awareness of indigenous oil sources. In 1980 and 1981, exploration wells in the Mittelplate vicinity found oil in several sandstone layers. Due to the location of the field in an ecologically sensitive area, hydrographic, hydrodynamic and meteorological studies modelling storm, wave and ice-flow conditions were done, with the result that an artificial island holding a drilling and production facility was built in 1985.[4]

Geology

The oil in the Mittelplate field is trapped in Dogger (Middle Jurassic) sandstones of uppermost Aalenian to lowermost Callovian in age. The five main sandstone reservoir units, known from oldest to youngest as the alpha-sand, beta-sand, gamma-sand, delta-sand and epsilon-sand, are separated by intervening sandy claystones, not of reservoir quality. The trap is formed on the flank of the Büsum salt dome, with the hydrocarbons sealed up-dip by the edge of the salt dome. The overall top seal is provided by Lower Cretaceous mudstones. The source rock for the oil found at Mittelplate is thought to be the underlying Lower Jurassic Liassic organic-rich claystone.[4]

Technical features

Mittelplate pipeline construction in the tidal flats

The island is protected by 11-metre-high (36 ft) sheet piling measures at 70 by 95 m (230 by 312 ft). The western section of the field includes 18 production wells. The first oil came onstream in 1987 and was delivered ashore on 45 by 18 m (148 by 59 ft) double hull barges. A new redevelopment plan included the construction of a land-based facility in Dieksand from which 2,000–3,000 m-long (6,600–9,800 ft) extended-reach production wells[4] were to tap into the eastern part of the field. As per the development program, a pilot well and seven high-tech extended-reach wells measuring at 7,727 m (25,351 ft), 8,284 m (27,178 ft), 8,367 m (27,451 ft), 8,995 m (29,511 ft), 9,275 m (30,430 ft), 8,450 m (27,720 ft), 8,672 m (28,451 ft) and a 4-kilometre (2.5 mi) section cutting through the Büsum salt diapir were to ensure a faster exploitation of the field. The redevelopment plan also included construction of 7.5 km (4.7 mi) pipelines from the island to Friedrichskoog-Spitze and a 2.8 km (1.7 mi) pipeline to the Dieksand Land Station. This was expected to enable the Mittelplate consortium to transport up to 1 million tonnes or 7,550,000 barrels (1,200,000 m3) of oil a year.[5] Oil is pumped ashore and water extracted during processing is then routed back by the second pipeline for reinjection into the lower section of the reservoir. The modified island facility now contains living accommodation for up to 96 people.[1][6]

Ownership

The Mittelplate is operated and solely owned by Wintershall Dea. Out of a total capital spending of €670 million, €100 million was spent on construction of the pipeline transporting crude oil ashore and €50 million was spent on construction of a new T-150 drilling rig.[7]

Production

Mittelplate A as seen from the sea, in the background you can see the coast

Starting from October 1987, the field has been tapped in several sandstone layers at depths reaching 2,000–3,000 m (6,600–9,800 ft).[2] The size of the deposit was adjusted upward to over 100 million tons, of which 15 million tons were extracted by June 2005. The annual production of Mittelplate Island amounts to 900,000 tons of oil (about 18,100 barrels of oil per day). Under prevailing conditions, about 40 million tons are still economically extractable.[1] Since 2000, nearly horizontal wells (some up to about 9,200 metres [30,200 ft] long) have been extracting from the eastern part of the field directly from land on Dieksand / Friedrichskoog. The oil is piped from there to Brunsbüttel and onward to oil refineries in Hemmingstedt.

Safety and environmental protection

The companies developing the field spent a substantial part of €670 million already invested over 20 years into industrial safety and environmental protection programs due to unique location of the field in Wattenmeer tidelands.[2] Pipe-laying in the area and production in the field have been in accord with National Parks Law.[6] However, Greenpeace along with World Wildlife Fund (WWF) have been active critics of the field development in Wattenmeer. The national park is home to nearly 4,000 species, 250 of which do not exist anywhere in the world but Wattenmeer. Up to 12 million migratory birds use the park—which is rich of mussels, worms, snails, and shrimp—as a resting place. Nearly 200,000 shelducks are believed to gather around the Elbe river estuary each summer.[8]

References

  1. ^ a b c Offshore Technology. Mittelplate Redevelopment, Germany
  2. ^ a b c RWE description of Mitteplate Archived 2010-05-05 at the Wayback Machine
  3. ^ Wintershall Press Release 2006. Mittelplate Consortium: New drilling rig develops more Mittelplate oil Archived 2011-06-06 at the Wayback Machine
  4. ^ a b c "The Mittelplate oil field". Petroleum Geology Conference Series. Archived from the original on 22 February 2013.
  5. ^ John Bradbury (2005-01-05). "Mittelplate's makeover". E&P. Hart Energy Publishing, LP. Retrieved 2009-12-21.
  6. ^ a b The Mittelplate project - a production platform in the North Sea tidal flats
  7. ^ "RWE celebrates 20 years' oil production from Mittelplate Island". Scandinavian Oil and Gas Magazine. 2007-10-07. Retrieved 2009-12-23.
  8. ^ Rafaela von Bredow (2008-08-02). "Drilling for Oil in a Coastal Paradise". Spiegel Online International. Retrieved 2009-12-23.

External links

This page was last edited on 19 August 2023, at 20:18
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.