To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Piper oilfield

From Wikipedia, the free encyclopedia

Piper oilfield
North Sea Oil and Gas Fields
Location of Piper oilfield
CountryScotland, United Kingdom
LocationNorth Sea
Offshore/onshoreOffshore
Coordinates58°17′N 0°07′E / 58.28°N 0.12°E / 58.28; 0.12
OperatorRepsol Resources UK
Field history
Discovery1973
Start of production1976
Production
Peak of production (oil)300,000 barrels per day (~1.5×10^7 t/a)

The Piper oilfield is a substantial North Sea oilfield covering 30.1 km2 (11½ sq. mi.). It lies roughly halfway between Aberdeen and Bergen, at the eastern end of the Moray Firth basin.[1] Oil extracted from it is piped to Scotland, where it is stabilised at an oil plant on the island of Flotta, in the Orkney archipelago, while gas is shipped via the Frigg gas pipeline.[1] In June 1975, the Piper Alpha oil platform was placed over the field in 144 metres (79 fathoms) of water, secured in place by 24 piles extending 116 metres (63 fathoms) beneath the seabed. The platform was designed for simultaneous drilling and production.[1] Piper Alpha was the site of one of the world's worst oil platform disasters when it was destroyed by an explosion in 1988, with the loss of 167 lives. Piper Bravo was installed in 1992.[2] Talisman Energy acquired a controlling interest in 2000.[3]

Occidental Petroleum Corp., Getty Oil (Britain) Ltd., Thomson North Sea Ltd., and Allied Chemical (North Sea) Ltd.,[1] that later transformed into the OPCAL joint venture, obtained an oil exploration licence in 1972 and discovered the Piper oilfield in early 1973 after seismically mapping the area.[1] Oil production started in 1976 with about 250,000 barrels per day (40,000 m3/d) increasing to 300,000 barrels per day (48,000 m3/d). A gas recovery module was installed by 1980. Production declined to 125,000 barrels per day (19,900 m3/d) by 1988. OPCAL built the Flotta oil terminal in the Orkney Islands to receive and process oil from the Piper, Claymore and Tartan fields, each with its own platform. A 30-inch (760 mm) diameter main oil pipeline ran 128 miles (206 km) from Piper Alpha to Flotta, with a short oil pipeline from the Claymore platform joining it some 20 miles (32 km) to the west. The Tartan field also fed oil to Claymore and then onto the main line to Flotta.[4] Separate 46 cm (18") diameter gas pipelines run from Piper to the Tartan platform, and from Piper to the gas compressing platform MCP-01 some 30 miles (48 km) to the northwest.

YouTube Encyclopedic

  • 1/3
    Views:
    121 143
    409
    796
  • Explosion in the North Sea (Piper Alpha Disaster)
  • Piper 25 Conference - Steve Rae
  • Commissioning Training - Safety - Piper Alpha - with David Nisbett

Transcription

Geology

The field consists of three folded, tilted blocks on the northern edge of the Witch Ground Graben.[1] Production is from the Upper Jurassic Piper Sandstone, a sandstone shelf with a thickness up to 142 metres (465') and Oil-water contact ranging in depths from 2195 to 2804 metres (7201' to 9200') under the sea.[1] Piper oil most likely originated in the Kimmeridge Shale.[5]

See also

References

  1. ^ a b c d e f g Maher, C.E., Piper Oil Field, in Giant Oil and Gas Fields of the Decade:1968-1978, AAPG Memoir 30, Halbouty, M.T., editor, Tulsa:American Association of Petroleum Geologists, ISBN 0891813063, pp. 131-133
  2. ^ "Talisman Energy information about Piper Bravo" (PDF). Archived from the original (PDF) on 2014-11-25. Retrieved 2013-10-04.
  3. ^ Talisman Energy February 9, 2000 Announcement
  4. ^ pipeline dimensions Archived 2016-12-01 at the Wayback Machine
  5. ^ Maher, C.E., Piper Oil Field, in Giant Oil and Gas Fields of the Decade:1968-1978, AAPG Memoir 30, Halbouty, M.T., editor, Tulsa:American Association of Petroleum Geologists, ISBN 0891813063, p. 159

External links

This page was last edited on 23 November 2023, at 20:33
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.