To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Teesta Low Dam - IV Hydropower Plant

From Wikipedia, the free encyclopedia

Teesta Low Dam - IV
Location of Teesta Low Dam - IV in West Bengal
Teesta Low Dam - IV Hydropower Plant (India)
Official nameTeesta Low Dam - IV Hydropower Plant
CountryIndia
LocationKalijhora, Kalimpong district, West Bengal
Coordinates26°56′02″N 88°26′49″E / 26.9339354°N 88.4470021°E / 26.9339354; 88.4470021
PurposePower
StatusOperational
Opening date2016
Owner(s)NHPC
Dam and spillways
ImpoundsTeesta River
Height54 m (177 ft)
Length530 m (1,739 ft)
Power Station
Commission date2016[1]
TypeRun-of-the-river
Hydraulic head25.05 m (82 ft) (gross)
Turbines4 X 40 MW
Installed capacity160 MW[1]
Annual generation720 MU[1]

Teesta Low Dam - IV Hydropower Plant[2] is a run-of-the-river hydroelectric station built on the Teesta River at Kalijhora, Kalimpong district, West Bengal.

YouTube Encyclopedic

  • 1/3
    Views:
    918
    69 016
    524 844
  • Teesta Low Dam Project #NHPC # Small trip to teesta low dam
  • Tista and Rangeet river hydro power dam projects in Sikkim Himalaya : aerial journey
  • Hydroelectric Power Plant || Hydro Power Plant || Pumped Storage Power Plant

Transcription

Geography

Places in the Kalimpong Sadar subdivision in Kalimpong district
CT: census town, R: rural/ urban centre, M: municipality, F: facility, NP: national park
Abbreviations used in names – TG for Tea Garden (town/village)
Owing to space constraints in the small map, the actual locations in a larger map may vary slightly
Map
About OpenStreetMaps
Maps: terms of use
8km
5miles
none
S
I
K
K
I
M
B
H
U
T
A
N
Teesta Low
Dam III
D
Teesta Low Dam - III Hydropower Plant
Teesta Low
Dam IV
D
Jaldhaka River
Teesta
River
Neora Valley
National Park
NP
Neora Valley National Park (NP)
Dr. Graham's Homes
F
Dr. Graham's Homes (F)
Dungra
CT
Dungra, Kalimpong (CT)
Kalimpong
M
Kalimpong (M)
Mansong
R
Mansong (R)
Kolakham
R
Kolakham (R)
Nimbong
R
Nimbong (R)
Todey
Tangta
R
Todey Tangta (R)
Teesta Bazaar
R
Teesta Bazaar (R)
Suntalekhola
RV
Suntalekhola (R)
Sillery Gaon
R
Sillery Gaon (R)
Samabiyong TG
R
Samabiyong Tea Garden (R)
Rongo
R
Rongo, Kalimpong (R)
Rishyap
R
Rishyap (R)
Rambi Bazar
R
Rambi Bazar (R)
Ramdhura
R
Ramdhura (R)
Pedong
R
Pedong (R)
Kalijhora
R
Kalijhora (R)
Mongpong
R
Mongpong (R)
Lower Fagu TG
R
Lower Fagu Tea Garden (R)
Loleygaon
R
Loleygaon (R)
Lava
R
Lava, West Bengal (R)
Kumai TG
R
Kumai Tea Garden (R)
Jhalong
R
Jhalong (R)
Jaldhaka
R
Jaldhaka (R)
Icche Gaon
R
Icche Gaon (R)
Gorubathan
R
Gorubathan (R)
Bindu
R
Bindu, Kalimpong (R)
Bich Kagay
R
Bich Kagay (R)
Bhalukhop
R
Bhalukhop (R)
Algarah
R
Algarah (R)

Location

It is located in Kalimpong district, West Bengal, about 350 meters above the confluence of the Kalijora river Teesta River and in the 1.5 kilometer kiln of Teesta Bridge near Teesta Bazar village. 18.3 km downstream from the Teesta bridge near at Tista Bazar village. It is near Kalijhora, (see map alongside).

The project

The project consists of a 45 m high dam with 4 penstocks of 45 m length and 7 m diameter each. The surface power house with installed capacity of 160 MW houses 4 units of 40 MW capacity each designed to operate under the net rated head of 25.05 M and designed to generate 720 million units in a 90% dependable year with 95% machine availability. Unit I, II, III and IV were commissioned in the month of February, March, July and August 2016[1][3] respectively. The state of West Bengal is the sole beneficiary of this power station. With the construction of the project the area is also benefited by development infrastructure, education, medical facilities and employment avenues.

References

  1. ^ a b c d "NHPC completes Teesta Low Dam-IV hydro project". 19 August 2016. Retrieved 31 January 2020.
  2. ^ "Teesta Low Dam - IV". nhpcindia.com. Retrieved 31 January 2020.
  3. ^ "BHEL starts 40-mw hydro power unit in West Bengal". The Economic Times. Retrieved 31 January 2020.
This page was last edited on 30 November 2022, at 01:44
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.